FINLAY’S YARD, MANCHESTER

HOUSING & RESIDENTIAL

LOCATION

Manchester

SECTOR

Residential

CLIENT

Three Popes Ltd

ARCHITECT

Stephenson Studio

PROJECT VALUE

£3m

CONTRACT

Traditional with CDP

PERIOD

July 2020 – Nov 2021

CONTRACT PERIOD

68 Weeks

THE BRIEF

H.H. Smith were awarded this contract for the development of a new residential apartment building consisting of a ground floor, plus six upper floors with a total of 14 apartments in the bustling ‘Northern Quarter’ area of Manchester. The construction is based around a steel frame with timber upper floors, with a brick and glazed external facade. The works include a breakthrough into the adjacent residential building which the client owns. The apartments will be of a high residential specification. The architects, Stephenson Studio, approached H.H. Smith to undertake this scheme on the back of the successfully completed Hallé St. Peter’s project.

KEY POINTS

High acoustic performance and stringent fire strategies are major elements of the design. The processes will require robust sequencing of installations and testing along with stringent QA procedures. Avoiding any disruption to the adjacent properties will be of paramount importance

CHALLENGES

The Site is adjacent to an existing residential apartment building with a commercial building on the other side and this has made access extremely difficult. Construction of a 20 metre high building on such a small parcel of land provides logistical challenges and has required a detailed site logistic plan that involves partial road closures following close liaison with Manchester City Highways. Due to the poor ground conditions a CFA piled solution was installed with considerations made for the structural integrity of the adjoining properties.