• diane213

February 2020 Contract signed for New Hyde Pool

Construction of a new formal lane swimming pool and associated changing facilities is due to commence following contract signing. The 25 metre 6 lane pool will have spectator seating.


The works include the modification and extension of the existing leisure poo. The centre will remain open throughout the works with handover scheduled for February 2021.

















21 views

CONTACT US

Smith's Yard, Rear of 95 Bury Old Road, Whitefield, Manchester, M45 7AY

 

0161 280 3509  |     info@hhsmith.co.uk |     www.hhsmith.co.uk