May 2015 – H.H. Smith Handover The Mary Kelly Block Back To Holy Cross

Picture222

The Mary Kelly project was a 500m2 3 storey extension which had to mirror an existing building in addition to a 1000m2 refurbishment of the 2nd floor existing library. The building comprised a piled foundation and glazed sound proof offices as a feature of the refurbishment.

The £1.2m project which took 33 weeks was completed within budget and on time ready for the new college term.

Over a 10 year period H.H. Smith have worked with Holy Cross College, with works totalling in excess of £7.5million.

 

« Previous Post Next Post »